Inspection access backlogs
Booked inspections waiting for a silo to be empty and the required surfaces exposed.
Describe the problem
Include the material, last normal operation, current level information, outlet arrangement and any attempted intervention. Keep people away from unstable material and use only approved safe viewpoints. Include the last known normal level and any recent change to the stored product or process.
Immediate concern?
Follow the site’s emergency controls and isolate the affected area. Then send the facts you can gather safely.